Tight schedules · No shortcuts
Express processing for drone permits
5–7 working days instead of the usual 10–14, where the location allows it. Faster because the paperwork is clean on the first submission — not because anything is skipped.
- 5–7
- Working days · outside KKOP
- 10–15
- Working days · KKOP or FSC
- 30
- Working days · complex or night
- 15–20
- Days to lock in, peak season
There is no fast lane. Express is the same legal route, prepared so well that nothing comes back for correction.
- Filed only through official written channels — DGCA/DKPPU, AirNav/LPPNPI, airport authority, local government, SMS-FSC
- No affiliation with, or endorsement by, DGCA, TNI AU or any government body
- Every flight operated by a licensed AOC operator; this desk handles documentation and coordination, not aircraft
- Core documents: flight plan with coordinates and altitudes, insurance proof, operator licence, location permissions, production brief
- Compliance baseline: UU No. 1/2009, PM 90/2015, PM 180/2015 jo. PM 47/2016 and PM 37/2020
- Express is a preparation standard, not a queue position
How it works
Why a clean submission is faster
Standard timelines stretch because briefs arrive incomplete, maps are vague, and the risk assessment gets revised three times. Express front-loads all of that.
-
01
Everything geotagged first
Shot list, altitude bands, coordinates and date windows are finished before a single form is uploaded.
-
02
Cross-checked against zones
Each filming segment is tested against KKOP and restricted areas at intake, so no location is discovered to be unflyable after filing.
-
03
Clean on first pass
Each submission to DGCA/DKPPU, AirNav and the airport authority is complete the first time. The back-and-forth is where the weeks go.
-
04
Buffer where it matters
Night work, formations and anything resembling an aerial show get extra days built in rather than filed optimistically.
A documentary in January 2026 went from intake to written approvals in 7 working days because every segment was geotagged and cross-checked before filing. A multi-day real estate and beach shoot in August 2025 cleared in 8, having been confirmed in early July — before the rush window opened.
Express against the standard queue
-
Outside KKOP
- Express handling
- 5–7 working days
- Standard handling
- 10–14 working days
-
Inside KKOP / FSC
- Express handling
- 10–15 working days
- Standard handling
- 30–45 days
-
Intake
- Express handling
- Complete brief required up front
- Standard handling
- Brief can arrive in pieces
-
Revisions
- Express handling
- Designed out before filing
- Standard handling
- Handled as they come back
-
What changes
- Express handling
- The preparation
- Standard handling
- Nothing — same legal route
Express does not move a file up a queue and does not skip a step. The compression comes entirely from the submission being complete on first pass. Figures are as of August 2026.
Peak season is the real deadline
July to September and December to early January bring heavier traffic into Ngurah Rai and far more event and media permits across the island. Authorities are working through volume, and a simple request submitted late takes longer — particularly near Kuta, Seminyak, Nusa Dua and Sanur, all close to the 15 km buffer.
To keep an express track through those months, projects are locked in at least 15–20 working days before the first shooting date, even though the express work itself still runs in about 5–10. The lock-in is what buys the speed, not the effort afterwards.
Peak season also changes how certain work is read. Fireworks, drone-show formations and night events near crowded beaches are treated more carefully by every airspace stakeholder, so anything that resembles an aerial show gets extra buffer days rather than an optimistic filing.
Where express still works, and how fast
Three location types with very different express windows.
-
Denpasar city
Often intersects controlled airspace and, in some sectors, KKOP. The full chain applies, so allow at least 10 working days even on an express track.
-
Northern waterfalls
Away from the airport zone, the focus shifts to conservation rules, local government letters and community consent. A documentary crew cleared one in 6 working days.
-
Coral reef research
Adds environmental and sometimes academic ethics review. With the research proposal and marine park or university coordination provided early, 7–12 working days.
Questions about the timeline
Tell us the first shooting day
Dates, coordinates and the aircraft. We come back with whether the express window is realistic for your locations — and say so if it is not.