Standard permits 7–14 working days · KKOP zones 30–45

Tight schedules · No shortcuts

Express processing for drone permits

5–7 working days instead of the usual 10–14, where the location allows it. Faster because the paperwork is clean on the first submission — not because anything is skipped.

Camera operator moving with a shoulder-mounted camera
5–7
Working days · outside KKOP
10–15
Working days · KKOP or FSC
30
Working days · complex or night
15–20
Days to lock in, peak season

There is no fast lane. Express is the same legal route, prepared so well that nothing comes back for correction.

  • Filed only through official written channels — DGCA/DKPPU, AirNav/LPPNPI, airport authority, local government, SMS-FSC
  • No affiliation with, or endorsement by, DGCA, TNI AU or any government body
  • Every flight operated by a licensed AOC operator; this desk handles documentation and coordination, not aircraft
  • Core documents: flight plan with coordinates and altitudes, insurance proof, operator licence, location permissions, production brief
  • Compliance baseline: UU No. 1/2009, PM 90/2015, PM 180/2015 jo. PM 47/2016 and PM 37/2020
  • Express is a preparation standard, not a queue position

How it works

Why a clean submission is faster

Standard timelines stretch because briefs arrive incomplete, maps are vague, and the risk assessment gets revised three times. Express front-loads all of that.

  1. 01

    Everything geotagged first

    Shot list, altitude bands, coordinates and date windows are finished before a single form is uploaded.

  2. 02

    Cross-checked against zones

    Each filming segment is tested against KKOP and restricted areas at intake, so no location is discovered to be unflyable after filing.

  3. 03

    Clean on first pass

    Each submission to DGCA/DKPPU, AirNav and the airport authority is complete the first time. The back-and-forth is where the weeks go.

  4. 04

    Buffer where it matters

    Night work, formations and anything resembling an aerial show get extra days built in rather than filed optimistically.

A documentary in January 2026 went from intake to written approvals in 7 working days because every segment was geotagged and cross-checked before filing. A multi-day real estate and beach shoot in August 2025 cleared in 8, having been confirmed in early July — before the rush window opened.

Express against the standard queue

  • Outside KKOP

    Express handling
    5–7 working days
    Standard handling
    10–14 working days
  • Inside KKOP / FSC

    Express handling
    10–15 working days
    Standard handling
    30–45 days
  • Intake

    Express handling
    Complete brief required up front
    Standard handling
    Brief can arrive in pieces
  • Revisions

    Express handling
    Designed out before filing
    Standard handling
    Handled as they come back
  • What changes

    Express handling
    The preparation
    Standard handling
    Nothing — same legal route

Express does not move a file up a queue and does not skip a step. The compression comes entirely from the submission being complete on first pass. Figures are as of August 2026.

Peak season is the real deadline

July to September and December to early January bring heavier traffic into Ngurah Rai and far more event and media permits across the island. Authorities are working through volume, and a simple request submitted late takes longer — particularly near Kuta, Seminyak, Nusa Dua and Sanur, all close to the 15 km buffer.

To keep an express track through those months, projects are locked in at least 15–20 working days before the first shooting date, even though the express work itself still runs in about 5–10. The lock-in is what buys the speed, not the effort afterwards.

Peak season also changes how certain work is read. Fireworks, drone-show formations and night events near crowded beaches are treated more carefully by every airspace stakeholder, so anything that resembles an aerial show gets extra buffer days rather than an optimistic filing.

Production crew working under lights

Where express still works, and how fast

Three location types with very different express windows.

  • Denpasar city

    Often intersects controlled airspace and, in some sectors, KKOP. The full chain applies, so allow at least 10 working days even on an express track.

  • Northern waterfalls

    Away from the airport zone, the focus shifts to conservation rules, local government letters and community consent. A documentary crew cleared one in 6 working days.

  • Coral reef research

    Adds environmental and sometimes academic ethics review. With the research proposal and marine park or university coordination provided early, 7–12 working days.

Questions about the timeline

Tell us the first shooting day

Dates, coordinates and the aircraft. We come back with whether the express window is realistic for your locations — and say so if it is not.