Skip to content

Standard permits 7–14 working days · KKOP zones 30–45

Ngurah Rai · KKOP · SMS-FSC

Bali airport drone flight clearance

Written approval from DGCA, AirNav Indonesia and the airport authority, filed through the official SMS-FSC system. 14–30 working days for most shoots inside the Ngurah Rai safety zone.

Airport runway photographed from the air at sunset
14–30
Working days · standard clearance
15km
Practical no-fly radius
120m
AGL cap in sensitive zones
30–45
Working days · above 400 ft

A geofence warning in your drone app is not clearance. Inside KKOP you need written DGCA approval and AirNav coordination.

  • Lead time 14–30 working days; 30–45 for multi-day work or flights above 400 ft
  • Documents: passport, UAV specs and serial numbers, insurance, storyboard, GPS coordinates
  • Filed through official SMS-FSC, DGCA and AirNav channels only — never a verbal approval
  • Altitude usually capped at 120 m AGL, tighter near the runway extensions
  • Privacy conditions applied around villas, hotel pools and private events
  • A licensed AOC operator crew may be required on site, billed separately

How clearance works around Ngurah Rai

Drone operations inside KKOP or controlled airspace are governed by UU No. 1 Tahun 2009 and PM 37 Tahun 2020. Both require written approval from the Directorate General of Civil Aviation and coordination with AirNav Indonesia.

The practical no-fly radius around Ngurah Rai is treated as roughly 15 km — which covers Kuta, Seminyak, Jimbaran, Nusa Dua and parts of Sanur. Commercial flights there need a formal Flight Security Clearance through the national SMS-FSC platform.

We prepare the flight plans, risk assessments and obstacle analyses against the actual runway directions and approach paths, working with licensed AOC operators. That is the part that stops a last-minute denial from the airport authority.

Airport control tower against a sunset sky

Inside the zone

Where KKOP actually bites

South Bali's best locations are the ones closest to the runway. These are the briefs that need clearance before anything else is booked.

  • Jimbaran Bay cliffs

    Cliff-line hotel and resort content sits well inside the approach path.

  • Nusa Dua resorts

    Several resort footprints fall inside KKOP; low passes carry conditions.

  • Kuta & Seminyak rooftops

    Tall rooftops are measured on obstacle height, not just distance.

  • Beachfront weddings

    South-coast event aerials usually need clearance plus on-site supervision.

  • Road & tunnel projects

    Infrastructure filming can cross departure and missed-approach corridors.

  • Villa marketing

    Privacy limits apply where neighbouring villas share the same sightline.

Inside KKOP versus outside it

  • Lead time

    Inside KKOP
    14–30 working days
    Outside KKOP
    7–14 working days
  • Reviewed by

    Inside KKOP
    DGCA, AirNav and airport authority
    Outside KKOP
    DGCA and AirNav
  • Filing channel

    Inside KKOP
    SMS-FSC plus airport liaison
    Outside KKOP
    Standard DGCA filing
  • Service fee

    Inside KKOP
    Roughly 40–150% higher
    Outside KKOP
    Base handling fee
  • On-site crew

    Inside KKOP
    Licensed AOC operator often required
    Outside KKOP
    Usually not required
  • Altitude

    Inside KKOP
    Tighter near runway extensions
    Outside KKOP
    120 m AGL standard

Indicative and dated August 2026. The uplift depends on altitude, how tight the schedule is, and whether extra safety studies or airport liaison meetings are needed.

What else sits around the clearance

Three things that come up on almost every international brief.

  • Gili and Lombok in one cycle

    Neighbouring islands can be planned in the same cycle, though they involve separate authorities and sometimes a different airspace class.

  • Bilingual document packs

    English plus Arabic or Bahasa Indonesia, so client legal and marketing teams can read the KKOP constraints themselves.

  • Bank transfer in IDR

    Staged IDR billing with pro-forma invoices and supporting documents for finance departments.

Questions about the zone

Check your location before you book flights

Send the coordinates, the dates and the aircraft. We come back with whether it sits inside KKOP, a realistic lead time and a quote.